📞 +82 10-7262-8881

HomeServices › Drain camera inspection

When Everyone Has a Theory About Your Pipe, Get Footage

The landlord says you caused it. The building office says it's your unit. The last handyman shrugged. A camera run replaces all of that with a recording of what is physically inside the line — and in a rental dispute, footage speaks every language.

When a camera run is worth the money

  • A drain re-blocks on a schedule and each visit treats the symptom, never the cause
  • You're blamed for a blockage you suspect started in the building's shared line — the camera shows which side of the wall the problem sits on
  • You're about to sign a lease on an older villa and want to know what the pipes look like before the deposit leaves your account
  • Renovation is planned and nobody has a drawing of where the drain lines actually run
  • Something valuable went down and you need its exact location before any recovery attempt
  • A jetting or repair job just finished and you want independent proof it worked

We'll also tell you when it's not worth it. A first-time, obvious clog usually doesn't need a camera — clearing it costs less than filming it. If your symptom sounds like that, we'll say so by text and save you the inspection.

What an inspection looks like

1 · Describe the mystery

Text us the history: what blocks, how often, what's been tried. We confirm whether a camera run makes sense and what access we'll need.

2 · Agree the price first

Often combined with jetting or leak work; we tell you the combined fixed price first. Either way you approve one fixed figure, VAT-included total stated, before the camera goes in.

3 · Run the line on screen

The camera travels the pipe while you watch live: grease layers, sags where water pools, joints pushed apart, roots, or the earring you lost in March.

4 · Take the evidence with you

You get the key frames and clips, plus a short written summary in English by text — ready to forward to your landlord, the building office (관리실), or an insurer.

Price

Quoted on site · VAT 10% separate

Often combined with jetting or leak work; we tell you the combined fixed price first.

  • Fixed quote before work starts — you agree to the number first. If the scope turns out to be different mid-job, we stop and explain before anything continues.
  • Same rates at night, on weekends and on holidays.
  • Card payment accepted. Cash receipt or corporate tax invoice (세금계산서) issued on request.
  • VAT 10% is quoted separately, and we tell you the VAT-included total before starting.

Tell Us What's Happening

Text works best — describe the problem and send photos. Same rates day, night, weekends and holidays.

📞 Call Now 💬 Text Us